I have a list of procedures such as
- Do this
- Do that
- Do the same thing as done in step 2, but differently
- Do some more of this
- Wave that over there
In this example I have one bullet point referenced in another bullet point. Step 2 is referenced in Step 3.
How can I link the "step 2" in Step 3 so that if the numbering on Step 2 were to change, it would also change the "step 2" to follow.
For instance, if I realize I forgot a step and insert it into the beginning of my list of procedures, I would like "links" to update as well.
- Start the thing
- Do this
- Do that
- Do that same thing as step 3 but differently
- Do some more of this
- Wave that over there
Is this even possible ?