Ok, so I have been given tasks to do at work with time limits that are set in decimal values (I.E. Time to complete 0.064). Basing this of an 8 hour day I know how to convert this into a time format (I.E. 0h 30m) but how would I show this in percentages where the 8 hour day would be 100% and the time of task would be deducted from 100%? So if the task took 0.5, the percent would read 50% etc etc?
Working in Excel Sheet.
Thanks.